Work is moving along quickly now. Tree removal is almost complete, preload areas on holes 7 and 8 have been started, old irrigation has been removed and new irrigation is being installed (in areas not being disturbed). Equipment is on its way to start screening the loam on hole 5. We also anticipate the bridge construction work to begin within the next two weeks.
This is looking at the right side of 6 green from 7 fwy. 7 forward tee is right to the left of this water.
Looking right from 5 fwy at tree removal for compensatory storage area
Picture looking at the pump station from 5 fairway. Showing tree removal for compensatory storage area
Looking at 7 fwys Preload area. Another 3 feet more in height to go.
8 fairway being prepared for preload
8 fairway being rototilled